Airlifting wet concrete into transmission tower sites in Soledad Canyon for tower footings with large Sikorsky helicopter. [with 18 variants]
photCL SCE 06 - 71324

Visual Materials
["Skycrane" helicopter transporting pre-assembled, H-frame pole towers, and single poles into remote tower sites for installation.] [with 46 variants]
photCL SCE 06 - 71984

Visual Materials
Sikorsky Helicopter airlifting concrete for tower footings from mixer trucks to tower sites. [with 23 variants]
photCL SCE 06 - 71122

Visual Materials
[Placing pre-constructed sections of transmission towers in remote locations with a Sky-crane helicopter.] [with 5 variants - 2 frames per neg)
photCL SCE 06 - 72918

Visual Materials
Large Sikorsky helicopter airlifting and placing pre-assembled poles into remote sites in Santa Barbara [with 9 variants]
photCL SCE 06 - 71116

Visual Materials
Sikorsky helicopter airlifting power poles into tower sites in the forest [with 3 variants]