Visual Materials
San Onofre Nuclear Generating Station, Unit #1
You might also be interested in
Image not available
San Onofre Nuclear Generating Station - Unit 1 Control Room - Operator at control room switchboard going through final testing for Unit 1
Visual Materials
San Onofre Nuclear Generating Station - Unit 1 Control Room - Operator at control room switchboard going through final testing for Unit 1.
photCL SCE 06 - 73030

San Onofre Nuclear Generating Station
Visual Materials
San Onofre Nuclear Generating Station - Operator working in control room and engineer working with turbine assembly. [color, with 3 variants2]
photCL SCE 08 - 00303

San Onofre Nuclear Generating Station, Unit #1
Visual Materials
San Onofre Nuclear Generating Station, Unit #1 - Loading fuel assemblies into reactor. (may be first loading in 1967)
photCL SCE 08 - 00218

San Onofre Nuclear Generating Station, Unit #1
Visual Materials
[San Onofre Nuclear Generating Station, Unit #1 - near end of construction] [with 3 variants]
photCL SCE 06 - 72141

San Onofre Nuclear Generating Station
Visual Materials
[San Onofre Nuclear Generating Station - Station overview, control room, reactor, station substation, transmission substation (Valley? Serrano?...), 500kV transmission line...] [with 31 variants]
photCL SCE 06 - 72933

San Onofre Nuclear Generating Station
Visual Materials
San Onofre Nuclear Generating Station - Unit 1 dome prior to remodeling of containment building. [color, with 4 variants]
photCL SCE 08 - 00301