Visual Materials
Florence dam construction
- Description
- Florence dam construction - View taken from top of main river section tower showing camp 64 in the background. Frog pond section of dam on right and the ditch recently completed by the Erie shovel to drain the frog pond into main intake channel.
- Date
- 10/1/1925
- Call number
- photCL SCE 10 - 00022





