Visual Materials
Stub hole excavating gang, Camp #3. ; Stub hole excavating crew, lunch. ; Tower M0T2, blasting for foundation
You might also be interested in

Transposition Tower Vincent line Mt. Gleason. ; First tower erected by J.C. Christy gang M1-T1 Camp #1
Visual Materials
A - Transposition Tower Vincent line Mt. Gleason. B - First tower erected by J.C. Christy gang M1-T1 Camp #1
photCL SCE 10 - 00115

A construction crew excavating the foundation for Kaweah #3 Power House
Visual Materials
A construction crew excavating the foundation for Kaweah #3 Power House, ca. 1913.
photCL SCE 04 - 00167

A construction crew excavating for the foundation for Kaweah #3 Power House
Visual Materials
A construction crew excavating for the foundation for Kaweah #3 Power House, ca. 1913.
photCL SCE 04 - 00155

Camp at Watts Valley. ; Camp #8, Big Tujunga Canyon. ; J. C. Christy & Crew at Bakersfield
Visual Materials
A - Camp at Watts Valley. B - Camp #8, Big Tujunga Canyon. C - J. C. Christy & Crew at Bakersfield.
photCL SCE 10 - 00129

Excavating for foundation of tower on the Long Beach transmission line
Visual Materials
Excavating for foundation of tower on the Long Beach transmission line.
photCL SCE 02 - 01217

The construction crew at Mill Creek #3 Hydro Plant excavating for foundations
Visual Materials
The construction crew at Mill Creek #3 Hydro Plant excavating for foundations, showing a small horse team.
photCL SCE 01 - 00114