Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
A Southern Sierras line crew in the 1920s. Pg. 131.
photCL SCE 11 - 00272

Visual Materials
Working over 150 feet above the desert floor, an Edison crew assembles a tower for the Vincent-Lugo transmission line. Pg. 223
photCL SCE 11 - 00450

Visual Materials
Edison's street lighting load increased in the postwar period as tract homes spread across Southern California. Pg. 209.
photCL SCE 11 - 00418

Visual Materials
Dramatic view of the building of the Vincent-Lugo 500kV transmission line, part of Edison's bulk power "backbone". Pg. 224.
photCL SCE 11 - 00451

Visual Materials
Southern Sierras Power's El Centro Substation was the terminus of a transmission line from the Bishop Creek Hydro Plants. It started life as Holton Power Company's gas-electric power plant. Pg. 120.
photCL SCE 11 - 00246

Visual Materials
Edison crews install new Dreyfus-designed 220kV towers in El Segundo. Pg. 230.
photCL SCE 11 - 00465