Building Ventura County Power Company's Castaic-Saticoy 33,000-volt line, 1907. Pg. 65.
photCL SCE 11 - 00132

Visual Materials
Ventura County Power Company's headquarters office in Ventura, about 1910. Pg. 64
photCL SCE 11 - 00130

Visual Materials
Southern Sierras Power's El Centro Substation was the terminus of a transmission line from the Bishop Creek Hydro Plants. It started life as Holton Power Company's gas-electric power plant. Pg. 120.
photCL SCE 11 - 00246

Visual Materials
Raising a power pole using gin-poles and lots of muscle, during construction of the line to Perris, 1912. Pg. 81.
photCL SCE 11 - 00170

Visual Materials
Preparing to pull through some more cable during the construction of a 500kV transmission line. Pg. 222.
photCL SCE 11 - 00448
Image not available
Visual Materials
Photographic map of Nevada-California Electric Corporation Transmission Line from Victorville to Boulder (Hoover) Dam site with profiles, tower drawings, as well as photographs of construction camps, tower installations, building tower bases, hanging insulators, stringing conductors, splicing conductor, switching towers, angle towers, angle "AP" type towers, dead end towers, and the Hoover Dam Substation.
photCL SCE