Photographs by Stone and Webster Construction Co. documenting construction of Big Creek Powerhouse No. 1 and Powerhouse No. 2 in Fresno Co., California. Job Order No. 1142
photCL SCE
Image not available
Visual Materials
Construction of Big Creek Powerhouse 1 and 2: Huntington Lake sawmill and logging; Camps 1a, 2, 6, and 7; Dams 1, 3, and 4; Incline railways; Penstocks; Flow pipes; Interior and exterior views of Powerhouse 1 and Powerhouse 2 construction; Tunnel 1; Incline railways. Photographer: Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Visual Materials
Construction of Big Creek Powerhouse 1 and 2 [Locomotive No. 11 in snow; snow survey; Construction Camps 1F, 2, 6, and 7; excavation tunnels 1 and 2; construction at Dams 1, 2, 3, and 4; penstock & flow-line construction; sawmill; gravel pit; incline railways; Cascada material staging.] Photographer: Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Visual Materials
Construction of Big Creek Powerhouse 1 and 2: Camp 7; meat house; Tunnels 3 and 4 east portal; Flowline; Dams 1, 2, 3, and 4; Powerhouse 1 and Powerhouse 2 switchboards; Oil switches; High tension bushings; Stand pipes and surge chamber. Photographer: Stone & Webster Engineering Corporation.
photCL SCE

Visual Materials
Big Creek Powerhouse #1 arose at the junction of Pitman Creek and Big Creek, on exactly the site proposed by John Eastwood a decade earlier. By April 1913 work was well under way. This view looks west down Big Creek Canyon, with the town of Cascada (Big Creek) just out of the picture at the right.
photCL SCE 12 - 00043
Image not available
Visual Materials
Construction of Big Creek Powerhouse 1 and 2: Sluicing construction sites; Camp 2 Warehouse; Meat storage and butchers; Concrete mixers; Camps 3, 6, and 7; Adit 2, and 3; Cascada yards; Transmission line construction; Excavation and construction at Dams 1, 2, 3, and 4, flowline, penstocks, surge shaft; Incline railway; Tunnels 1, and 2; Huntington Lake. Photographer: Stone & Webster Engineering Corporation.
photCL SCE