Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Image not available
Visual Materials
Album belonging to Robert McF. Doble, Consulting Engineer, and containing a map and photographs of hydroelectric development on the Kaweah River. Photographs include proposed site for Powerhouse No. 2, Middle Fork Kaweah River at National Park line, Atwell's Mill, Upper and Lower Monarch Lakes, cut at headworks of ditch for Plant No. 2, East Fork Kaweah River at National Park line, Junction of Marble and Middle Forks of Kaweah River, Eagle Lake, Lady Franklin Lake, Silver Lake. A typescript index appears at the end of the album. "Robert McF. Doble, Construction Engineer" stamped on cover.
photCL SCE

Visual Materials
The Middle Fork headworks at Kaweah #3 Hydro Plant, showing the river in the background.
photCL SCE 04 - 00240

Visual Materials
The Middle Fork headworks at Kaweah #3 Hydro Plant, showing the river in the foreground.
photCL SCE 04 - 00241

Visual Materials
The Middle Fork headworks at Kaweah #3 Hydro Plant, showing the river flowing along the rocks.
photCL SCE 04 - 00227

Visual Materials
The Middle Fork branch conduit at Kaweah #3 Hydro Plant, showing water flowing into a river.
photCL SCE 04 - 00243

Visual Materials
The Middle Fork dam at Kaweah #3 Hydro Plant.
photCL SCE 04 - 00270