Visual Materials
Eastwood Powerhouse crane lifts the 105 ton "turbine shutoff valve" off its transporter trailer inside the power station
You might also be interested in

An early John Eastwood drawing showing a multi-level power house to be located at the junction of Pitman Creek and Big Creek
Visual Materials
An early John Eastwood drawing showing a multi-level power house to be located at the junction of Pitman Creek and Big Creek, the site where Power House #1 was later in fact built, although to a different architectural style.
photCL SCE 12 - 00015
Image not available
On March 28, 1985, the first of the two massive girders for the overhead crane in Balsam Meadow's underground powerhouse was raised into position
Visual Materials
On March 28, 1985, the first of the two massive girders for the overhead crane in Balsam Meadow's underground powerhouse was raised into position. The completion of this crane was a major milestone in the Balsam Meadow Project, for would be used to install the power stations heavy components.
photCL SCE 12 - 00216