Visual Materials
Long Beach Steam Station
You might also be interested in
Image not available
Long Beach Steam Station construction, Big Creek, Mill Creek, Santa Ana River, Big Bear Lake
Visual Materials
Long Beach Steam Station No. 1 construction, interior of generator floor; man with divining rods; Kern River No. 3, including headquarters camp, plant site, river, Fairview Dam with fish ladder; Big Creek, including Huntington Lake, Huntington Lake Lodge, Dam 4, cottages, Powerhouse No. 8, road construction to Powerhouse No. 3; Santa Barbara facilities, including Substations, car barn, steam plants; Mill Creek No. 1, Santa Ana River No. 2 flowline, Santa Ana River No. 1 intake and siphon; Union Power Co. hydroelectric projects, such as multiple arch dam at Big Bear lake, tunnels and adits.
photCL SCE

Big Creek - rivers & streams
Visual Materials
Big Creek - rivers & streams, Powerhouse 2 interior, Cascada General Office, Huntington Lodge, Huntington Lake & Dam 1, Shaver Lake, PH #2, PH #8 interior & exterior, Dam 6 & Intake 3, PH #3; Vestal, Eagle Rock, Laguna Bell Substations; Mill Creek #1 exterior & interior; Kern River #3 exterior & interior, Kern River #1 interior; Long Beach Steam Plant #1; various executive portraits; and General Office at 3rd & Broadway.
photCL SCE 13 - vol 056

Big Creek - Early Big Creek
Visual Materials
Big Creek - Early Big Creek [Substations; Big Creek - PH 1 and PH 2 penstock construction, Huntington Lodge & Lake, heavy snowfall, break in PH1 penstock joint, const. Dam #1 & gate tower, Dam 1 spilling, Dam #2 const., Dam #4 const., PH1 const., PH1 interior, PH2 const., PH2 after fire, PH2 interiors (Units & Transformers), unit install PH1, incline RR, railroad locomotives, Big Creek transmission line const.; Magunden Sub.; Kern T/L poles, line and RR wash out at Arroyo Seco; Long Beach Steam Plant; Los Angeles Aquiduct and Powerhouse; PL&P vehicles; Intake Azusa Plant, Azusa PH interior; Highgrove forebay & Powerhouse; Stone Castle; Sierra Powerhouse interior, operator's cottages; Pedley Powerhouse (ext. & int.), Mentone PH; Borel Powerhouse]
photCL SCE 13 - vol 041
Image not available
Long Beach Steam Station
Visual Materials
Long Beach Steam Station - Plant 3 operational shots, turbine maintenance & repairs, broken blades on turbine stages, deposits on turbine blades, and continued construction for second half of Plant 3.
photCL SCE 13 - vol 093
Image not available
Construction of Long Beach Steam Plant #1
Visual Materials
Construction of Long Beach Steam Plant #1, showing framing stages during construction of steam plant and equipment installation at the plant.
photCL SCE 13 - vol 083

Borel interior with Pelton-Francis turbines
Visual Materials
Borel interior with Pelton-Francis turbines; Excavation for Big Creek Powerhouse #2; Huntington Lake construction for Trestle Dam 1, Dam 2; start of construction at Powerhouse #1 and Dam 4, installation of equipment at PH 1, penstock assembly, completion of Dam 4; construction of Big Creek PH 2; construction of Powerhouse #8, constructing road to PH 3, and Tule Powerhouse.
photCL SCE 13 - vol 059