Visual Materials
Edison Electric Company
You might also be interested in
Image not available
Mill Creek (copy prints)
Visual Materials
Contact copy prints of Mill Creek 2-3 intake and powerhouse and other; Engineering drawings of hydroelectric set-ups, insulators etc., many are prints from screened negatives.
photCL SCE

The Edison Electric Company
Visual Materials
Los Angeles #1, #2 & #3 Powerhouses (interior & exterior); EEC General Office const.; Pasadena office; SAR #1 construction & operation; EEC plant in Pomona; Mill Creek #1 interiors; Santa Ana office; Pumping Plants & Substations in Orange County; Redlands plant and office; Mill Creek 3 construction (interior & exterior), penstocks, units, air chambers, switch pole, intakes & dams, flowlines, cottages, sandbox; Long Beach electric plant & gas plant; Santa Monica engine #1; San Pedro gas plant & office; Santa Monica Office, Steam Plant & Gas Plant; Santa Barbara plants & offices; Long Beach plants & offices; San Bernardino; Colton; Kern River; Lytle Creek construction; Puente Sub. & cottage; Ontario #1 with interiors; Kern #1 construction - Democrat Dam, flumes, tunnel work, Powerhouse, penstock assembly, teams bringing equipment in, assembling units, spillway, transmission line; Castaic Sub.; and Fernando Sub.
photCL SCE 13 - vol 103

California Electric Power Corp. - Nevada-California Electric Corp
Visual Materials
California Electric Power Corp. - Nevada-California Electric Corp. - Descriptions & Costs for Nevada California Electric hydroelectric power development of the Mill Creek watershed, Lundy Dam & intake, Lundy Powerhouse. Project provided electricity for mining operations in Nevada (Aurora, Lucky Boy, Fairview, Wonder, & Rawhide. First 4 pages are missing. Photos are included throughout the report.
photCL SCE 13 - vol 148

Photos of Borel, Kern River #3, Santa Ana River #1, Mill Creek, PL&P construction photos from 1903, and Bear Valley Dam (Union Power Co.)
Visual Materials
Photos of Borel flume and canal work (mostly un-numbered), Borel headworks, Borel Powerhouse, Kern River #3 construction, Santa Ana River #1 powerhouse, SAR 1 intake, SAR 1 settling basin, SAR #2 powerhouse, Mill Creek #1 Powerhouse, Mill Creek #3 intake, Mill Creek cottages, SAR #3 flume construction, PL&P construction photos from 1903, Bear Valley Dam (Union Power Co.), Mill Creek 2&3 Powerhouse, SAR flood damage.
photCL SCE 13 - vol 073

California Electric Power Corp. - Southern Sierras Power Co
Visual Materials
California Electric Power Corp. - Southern Sierras Power Co. - Constructing San Bernardino Steam Plant, transformer assembly, water tank, boiler construction, turbine assembly, switchyard; facilities at Bakersfield, Goldfield, Tonopah, Owens River, Elsinore, San Bernardino, San Jacinto, Corona, Hemet, Perris, El Centro, and Coachella; Bishop Hydro facilities and construction of South Lake Dam; Nevada mining operations; Gem, Tioga, Saddlebags, Agnew, Summit, Rhinedollar, Crystal, Mono, and Lundy Lakes; Mill Creek Hydro construction - Mill Creek [Lundy] Powerhouse, wood-stave flowline, penstock, Lundy Dam,
photCL SCE 13 - vol 136

Mill Creek 1, 2&3 Powerhouse
Visual Materials
Mill Creek 1, 2&3 Powerhouse - The Headworks (dam and intake) for Mill Creek #3 Hydro Plant.
photCL SCE 02 - 01907