Visual Materials
2-10 Tule Siphon
- Description
- 2-10 Tule Siphon - First concrete placement in intake structure, using side boom cat and bottom dump hopper from transit mixer about 100 yds down slope.
- Date
- 9/6/1960
- Call number
- photCL SCE 02 - 44984
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
2-5 Tule Siphon - Side boom "Cat" on steep grade on upstream slope from "21" draw. (See sleeve S-F-02-44978)
photCL SCE 02 - 44979

Visual Materials
3-4 Tule Siphon - View from outlet slope toward intake showing all pipe distributed along line.
photCL SCE 02 - 44990

Visual Materials
2-6 Tule Siphon - Distributing pipe along intake slope from "16" draw. (See sleeve S-F-02-44978)
photCL SCE 02 - 44980

Visual Materials
2-2 Tule Siphon - Backfilling pipe in trench on ridge between "21" and "16" draws, looking toward intake. (in same sleeve as 44977)
photCL SCE 02 - 44976

Visual Materials
3-5 Tule Siphon - Placing final concrete in intake structure. (See sleeve S-F-02-44990)
photCL SCE 02 - 44991

Visual Materials
2-12 Tule Siphon - Progress photo, looking toward outlet from intake slope near 16 access road. (See sleeve S-F-02-44984)
photCL SCE 02 - 44986