Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Vermilion Dam - Auxiliary Drain #1, Toe drain outlet flooded by backwater from service spillway.
photCL SCE 02 - 44691

Visual Materials
Big Creek, Vermilion Dam - Lateral drains at upper end of auxiliary toe drain.
photCL SCE 02 - 44720

Visual Materials
Big Creek, Vermilion Dam - Downstream channel below toe drain.
photCL SCE 02 - 42971

Visual Materials
Big Creek, Vermilion Dam - Emergency overflow spillway channel.
photCL SCE 02 - 44540

Visual Materials
Big Creek, Vermilion Dam - Temp[orary] wier in toe drain channel after storm.
photCL SCE 02 - 43668

Visual Materials
Big Creek, Vermilion Dam - Damp area along toe of dam and east of service spillway prior to installation of pipe drains.
photCL SCE 02 - 44781