Visual Materials
Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Vermilion Dam - Toe drain outlet channel, back water at junction of spillway channel, looking southeast.
photCL SCE 02 - 44715

Visual Materials
Vermilion Dam - Auxiliary Drain #1, Toe drain outlet flooded by backwater from service spillway.
photCL SCE 02 - 44691

Visual Materials
Big Creek, Vermilion Dam - Lower toe drain outlet weir.
photCL SCE 02 - 42967

Visual Materials
Big Creek, Vermilion Dam - First in series of overlapping pictures taken to show the seepage from the east back [bank?] of Old Mono Channel from toe drain outlet weir to point approximately 200' downstream.
photCL SCE 02 - 44822

Visual Materials
Big Creek, Vermilion Dam - Upper toe drain outlet (before weir plate installation)
photCL SCE 02 - 42960

Visual Materials
Big Creek, Vermilion Dam - Compacting pervious fill over Toe Drain. Picture from junction of Toe Drain and Intermediate Drain.
photCL SCE 02 - 44317