Visual Materials
Big Creek, Vermilion Dam
- Description
- Big Creek, Vermilion Dam - Intake Channel covered by 4' of water.
- Date
- 5/21/1954
- Call number
- photCL SCE 02 - 44385
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Vermilion Dam - Intake Channel at high water period.
photCL SCE 02 - 44384

Visual Materials
Big Creek, Vermilion Dam - Forms for intake structure and closure section of conduit, also backfill in inlet channel.
photCL SCE 02 - 44204

Visual Materials
Big Creek, Vermilion Dam - Closure section and intake structure showing 3'-0" corrugated bypass, also inlet channel.
photCL SCE 02 - 44206

Visual Materials
Big Creek, Vermilion Dam - Toe drain outlet channel, back water at junction of spillway channel, looking southeast.
photCL SCE 02 - 44715

Visual Materials
Big Creek, Vermilion Dam - Discharge channel at high water period
photCL SCE 02 - 44386

Visual Materials
Big Creek, Vermilion Dam - Drainage channel, Borrow Pit #4.
photCL SCE 02 - 44331