Big Creek, Vermilion Dam
- Description
- Big Creek, Vermilion Dam - Transit toe drain pipes under outlet conduit.
- Date
- 8/7/1953
- Call number
- photCL SCE 02 - 44163
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Vermilion Dam - Toe drain trench crossing under outlet conduit.
photCL SCE 02 - 42689

Visual Materials
Big Creek, Vermilion Dam - Concrete encased drain pipes from toe to intermediate drain.
photCL SCE 02 - 42793

Visual Materials
Big Creek, Vermilion Dam - Lower toe drain outlet weir.
photCL SCE 02 - 42967

Visual Materials
Big Creek, Vermilion Dam - Upper toe drain outlet (before weir plate installation)
photCL SCE 02 - 42960

Visual Materials
Big Creek, Vermilion Dam - First overlapping picture upstream from toe drain outlet.
photCL SCE 02 - 44827

Visual Materials
Big Creek, Vermilion Dam - T. M. Leps at Verm[ilion] toe outlet - drain.
photCL SCE 02 - 43607