Visual Materials
Huntington Lake, Dam 1
- Description
- Huntington Lake, Dam 1 - Right angled V-notch weir installed at outlet end of sluice pipe toe of Huntington Lake Dam 1, for measuring total leakage collected from back of steel facing. Zero reading on weir is equivalent to 16 g/m on staff gauge.
- Date
- 11/10/1955
- Call number
- photCL SCE 02 - 43915






