Visual Materials
Portal Powerhouse
- Description
- Portal Powerhouse - Draft tube gates set temporarily in place till work resumes next year.
- Date
- 10/15/1955
- Call number
- photCL SCE 02 - 43779
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Portal Powerhouse - Top portion of draft tube gates while pumping out tailrace pool.
photCL SCE 02 - 44586

Visual Materials
Portal Powerhouse - First concrete around draft tube.
photCL SCE 02 - 43708

Visual Materials
Portal Powerhouse - First concrete around draft tube.
photCL SCE 02 - 43709

Visual Materials
Portal Powerhouse - Foundation excavation in firm decomposed granite draft tube side of powerhouse. Excavation approx. 1' above final grade.
photCL SCE 02 - 43546

Visual Materials
Portal Powerhouse - View down tailrace channel during tunnel outage for re-seating draft tube gate.
photCL SCE 02 - 44588

Visual Materials
Portal Powerhouse - View of forming for substructure concrete, showing neat excavation in tight decomposed granite for the draft tube encasement.
photCL SCE 02 - 43623