Visual Materials
Portal Powerhouse - Forebay
You might also be interested in

Portal Powerhouse - Forebay
Visual Materials
Portal Powerhouse - Forebay - View from downstream of sluice pipe foundation excavation.
photCL SCE 02 - 43588

Portal Powerhouse - Forebay
Visual Materials
Portal Powerhouse - Forebay - Placing earthfill upstream from sluice pipe.
photCL SCE 02 - 43596

Portal Powerhouse
Visual Materials
Portal Powerhouse - Forebay - Foundation excavation in vicinity of sluice pipe. Picture covers from axis to upstream toe. Dragline excavating for impervious cut-off upstream from toe to lessen seepage.
photCL SCE 02 - 43310

Portal Powerhouse - Forebay
Visual Materials
Portal Powerhouse - Forebay - Progress picture showing placement of upstream impervious fill in sluice pipe area, to top of 24" sluice pipe concrete encasement.
photCL SCE 02 - 43327

Portal Powerhouse - Forebay
Visual Materials
Portal Powerhouse - Forebay - Placing first fill in impervious section under location of sluice pipe. Note dozer pushing layer of saturated & disturbed surface material, exposing firm foundation, before fill placement.
photCL SCE 02 - 43315

Portal Powerhouse - Forebay
Visual Materials
Portal Powerhouse - Forebay - Preparation for rolling 24" diameter sluice pipe in place at forebay dam.
photCL SCE 02 - 43332