Visual Materials
Portal Powerhouse
- Description
- Portal Powerhouse - First concrete in powerhouse being placed in pump sump.
- Date
- 8/16/1955
- Call number
- photCL SCE 02 - 43551
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Portal Powerhouse - Last concrete being placed for season in expansion joint housing.
photCL SCE 02 - 43780

Visual Materials
Portal Powerhouse - Forms being erected for substructure concrete at powerhouse.
photCL SCE 02 - 43624

Visual Materials
Portal Powerhouse - First concrete around draft tube.
photCL SCE 02 - 43708

Visual Materials
Portal Powerhouse - First concrete around draft tube.
photCL SCE 02 - 43709

Visual Materials
Portal Powerhouse - Setting pump for the first pumping of pool at end of 12' diameter pipe.
photCL SCE 02 - 43309

Visual Materials
Portal Powerhouse - Portal Forebay - Bottom of vertical shaft in adit, shows upper portion of concrete bulkhead in adit.
photCL SCE 02 - 43790