Visual Materials
Redondo Beach Steam Station - Plants 2-5
- Description
- Redondo Beach Steam Station - Plants 2-5 - Looking north from south end of Boiler area excavation. Well drilling rig at left center and Raymond Pile Driver at right center.
- Date
- 11/6/1952
- Call number
- photCL SCE 02 - 43390






