Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Etiwanda Steam Station



You might also be interested in

  • Etiwanda Steam Station

    Etiwanda Steam Station

    Visual Materials

    Etiwanda Steam Station - Looking east showing Generator #1 Stator on timber cribbing ready to be rolled across to turbine foundation.

    photCL SCE 02 - 43161

  • Etiwanda Steam Station

    Etiwanda Steam Station

    Visual Materials

    Etiwanda Steam Station - Close-up showing boiler feed control valves.

    photCL SCE 02 - 43172

  • Etiwanda Steam Station

    Etiwanda Steam Station

    Visual Materials

    Etiwanda Steam Station - Close-up showing valving at air ejector.

    photCL SCE 02 - 43173

  • Etiwanda Steam Station

    Etiwanda Steam Station

    Visual Materials

    Etiwanda Steam Station - Close-up of operating level showing boiler circulating pump at left. View is looking west.

    photCL SCE 02 - 43171

  • Etiwanda Steam Station

    Etiwanda Steam Station

    Visual Materials

    Etiwanda Steam Station - Showing assembly of Unit #1 turbine.

    photCL SCE 02 - 43185

  • Etiwanda Steam Station

    Etiwanda Steam Station

    Visual Materials

    Etiwanda Steam Station - Close-up of erection on #2 turbine.

    photCL SCE 02 - 43237