Visual Materials
Etiwanda Steam Station
You might also be interested in

Etiwanda Steam Station - General view showing low temperature superheater elements of Boiler #1
Visual Materials
Etiwanda Steam Station - General view showing low temperature superheater elements of Boiler #1 - Rear steam cooled tubes are on rear left, front steam cooled wall tubes on right.
photCL SCE 02 - 43144

Etiwanda Steam Station - Progress of erection
Visual Materials
Etiwanda Steam Station - Progress of erection - Boiler #1. Looking south from operating deck level showing low temperature superheater header at upper right and furnace in background.
photCL SCE 02 - 43143

Etiwanda Steam Station
Visual Materials
Etiwanda Steam Station - View of Boiler #1 upper water wall headers at steam drum level. Front wall headers on extreme right and left.
photCL SCE 02 - 43121

Etiwanda Steam Station - Upper headers
Visual Materials
Etiwanda Steam Station - Upper headers - Boiler 2.
photCL SCE 02 - 43199

Etiwanda Steam Station
Visual Materials
Etiwanda Steam Station - Application of insulation on steam drum and reheat headers.
photCL SCE 02 - 43195

Etiwanda Steam Station
Visual Materials
Etiwanda Steam Station - Boiler #1 showing refractory work on steam cooled tubes.
photCL SCE 02 - 43183