Redondo Beach Steam Station - Plants 2-5 - Water pumps & traveling screens at #2 Screenwell.
photCL SCE 02 - 43505

Visual Materials
Redondo Beach Steam Station - Plants 2-5 - Water pumps & traveling screens at #2 screenwell.
photCL SCE 02 - 43520

Visual Materials
Redondo Beach Steam Station - Plants 2-5 - Screenwell & circulating water intake & discharge tunnel construction - looking north.
photCL SCE 02 - 43436

Visual Materials
Redondo Beach Steam Station - Plants 2-5 - Looking southeast showing sign and sheet piling for circulating water tunnels to existing screenwell.
photCL SCE 02 - 43407

Visual Materials
Redondo Beach Steam Station - Plants 2-5 - Looking south showing sheet piling and excavation for circulating water tunnels between new and existing screenwell.
photCL SCE 02 - 43412

Visual Materials
Redondo Beach Steam Station - Plants 2-5 - Excavation for water tunnel at screenwell #1.
photCL SCE 02 - 43448