Visual Materials
Big Creek Powerhouse 2A
- Description
- Big Creek Powerhouse 2A - Close-up of coil connections. Shows "U" is not installed on joint .
- Date
- Jan 1949
- Call number
- photCL SCE 02 - 28768
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse 2A - Close-up of coil connections. "U" is not installed yet.
photCL SCE 02 - 28767

Visual Materials
Big Creek Powerhouse 2A - New winding being installed. Filling compound on series coil connections.
photCL SCE 02 - 28799

Visual Materials
Big Creek Powerhouse 2A - Taped coil connections, and taped & untaped series connections of coil groups.
photCL SCE 02 - 28769

Visual Materials
Big Creek Powerhouse 2a - Construction (framing stage) - Close-up view of the foundation, wheel pits, structural steel, etc. for Powerhouse #2A.
photCL SCE 02 - 14731

Visual Materials
Big Creek Powerhouse 2A - Control device for CO2 equipment as installed in plant 2A.
photCL SCE 02 - 15931

Visual Materials
Big Creek Powerhouse 2A - #1 generator up-stream split - new winding being installed.
photCL SCE 02 - 28796