Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Kern River No. 1 - Borel intake - Transfer mechanism, conduit & waste gate controls.
photCL SCE 02 - 28728

Visual Materials
Kern River No. 1 - Borel intake - Transfer control on clutch - #1 & 2 waste gates.
photCL SCE 02 - 28727

Visual Materials
Kern River No. 1 - Borel intake - Operating mechanism, position indicator & push button station.
photCL SCE 02 - 28729
Image not available
Visual Materials
Photographs of Borel flume and canal work (mostly un-numbered), Borel headworks, Borel Powerhouse, Kern River No. 3 construction, Santa Ana River No. 1 powerhouse, Santa Ana River 1 intake, Santa Ana River 1 settling basin, Santa Ana River No. 2 powerhouse, Mill Creek No. 1 Powerhouse, Mill Creek No. 3 intake, Mill Creek cottages, Santa Ana River No. 3 flume construction, Pacific Light & Power construction Photographs from 1903, Bear Valley Dam (Union Power Co.), Mill Creek 2 and 3 Powerhouse, Santa Ana River flood damage.
photCL SCE

Visual Materials
Kern River No. 1 - Borel Intake. Automatic Pond level controller.
photCL SCE 02 - 28723

Visual Materials
Kern River No. 1 - Intake dam - [and headworks with sandbox in right foreground].
photCL SCE 02 - 01197