Visual Materials
Lee Vining Creek
- Description
- Lee Vining Creek - Powerhouse #1 [Poole Powerhouse]
- Date
- undated
- Call number
- photCL SCE 07 - 02569
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Image not available
Visual Materials
Two typescript reports containing photographs: the first related to the repair of Rush Creek Pipeline in 1922; the second report documents the construction of Lee Vining Creek Plant No. 1 [Poole Powerhouse], and the transmission line connecting it with the Rush Creek Plant in 1924.
photCL SCE

Visual Materials
Lee Vinning Creek - Powerhouse #1 [Poole Powerhouse]
photCL SCE 07 - 02568

Visual Materials
Lee Vinning Creek - Powerhouse #1 [Poole Powerhouse]
photCL SCE 07 - 02570

Visual Materials
Lee Vinning Creek - Powerhouse #1 [Poole Powerhouse] Apartment cottages.
photCL SCE 07 - 02571
Image not available
Visual Materials
Saddlebags Reservoir, Lee Vining Creek Watershed, Tioga Reservoir, Rhinedollar Reservoir, Sylvester Meadows, Rush Meadows Dam and Reservoir, Gem Lake Dam and Reservoir, Agnew Dam and Reservoir, Grant Lake Dam and Reservoir, Cain Ranch, Lee Vining Creek Cascades, Poole Powerhouse substation and penstock, Poole Powerhouse interior, Lee Vining Creek Plant No. 3, Mill Creek Plant (Lundy Powerhouse), Adams Main Plant (Owens River Gorge), Adams Cottages, and Adams Auxiliary Plant. First page states that photographs were "Taken in July, 1927, by Edwin Avery Field for the illustrated booklet of the Nevada-California Electric Corp."
photCL SCE
Image not available
Visual Materials
California Electric Power Corp. - Nevada-California Electric Corp. - Two Photo Reports - One documents repairs made to Rush Creek pipeline. Another documents the construction of Lee Vining Creek Plant #1 [Poole Powerhouse], and the transmission line connecting it with the Rush Creek Plant.
photCL SCE 13 - vol 149