Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Big Creek #1



You might also be interested in

  • Big Creek #1

    Big Creek #1

    Visual Materials

    Big Creek #1 - Piers for relocation of upper portion of Penstock #3.

    photCL SCE 02 - 28427

  • Big Creek #1

    Big Creek #1

    Visual Materials

    Big Creek #1 - Excavating with Drig. & feathers for upper anchor on penstock 3 rel..

    photCL SCE 02 - 28421

  • Big Creek #1

    Big Creek #1

    Visual Materials

    Big Creek #1 - Relocation of lower section of penstock.

    photCL SCE 02 - 30138

  • Big Creek - Powerhouse 8

    Big Creek - Powerhouse 8

    Visual Materials

    Big Creek - Powerhouse 8 - Break in lower section collapsed pipe [in the upper end of the penstock].

    photCL SCE 02 - 07191

  • Big Creek 2A  -  pipe fabrication

    Big Creek 2A - pipe fabrication

    Visual Materials

    Big Creek 2A - pipe fabrication (3651-A). Completed section of forged steel pipe with bolted flanged joints for Powerhouse 2A penstock. Largest sections were 66" inside diameter with 3" wall thickness, and 23 feet in length, weighing 27 tons. Picture taken in plant at Midvale Company.

    photCL SCE 02 - 22943

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Section of pipe on landing near Anchor 3.

    photCL SCE 02 - 09408