Visual Materials
Big Creek #1
You might also be interested in

Big Creek #1
Visual Materials
Big Creek #1 - Piers for relocation of upper portion of Penstock #3.
photCL SCE 02 - 28427

Big Creek #1
Visual Materials
Big Creek #1 - Excavating with Drig. & feathers for upper anchor on penstock 3 rel..
photCL SCE 02 - 28421

Big Creek #1
Visual Materials
Big Creek #1 - Relocation of lower section of penstock.
photCL SCE 02 - 30138

Big Creek - Powerhouse 8
Visual Materials
Big Creek - Powerhouse 8 - Break in lower section collapsed pipe [in the upper end of the penstock].
photCL SCE 02 - 07191

Big Creek 2A - pipe fabrication
Visual Materials
Big Creek 2A - pipe fabrication (3651-A). Completed section of forged steel pipe with bolted flanged joints for Powerhouse 2A penstock. Largest sections were 66" inside diameter with 3" wall thickness, and 23 feet in length, weighing 27 tons. Picture taken in plant at Midvale Company.
photCL SCE 02 - 22943

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Section of pipe on landing near Anchor 3.
photCL SCE 02 - 09408