Visual Materials
Big Creek #2A
You might also be interested in

Big Creek Powerhouse 2a
Visual Materials
Big Creek Powerhouse 2a - Showing foundation and tructural steel going up for PH #2A. The excavation for the Penstock is showing to good advantage in this photo also the road behind Powerhouses #2 and #2A.
photCL SCE 02 - 14730

Big Creek 2A - pipe fabrication
Visual Materials
Big Creek 2A - pipe fabrication (3651-A). Completed section of forged steel pipe with bolted flanged joints for Powerhouse 2A penstock. Largest sections were 66" inside diameter with 3" wall thickness, and 23 feet in length, weighing 27 tons. Picture taken in plant at Midvale Company.
photCL SCE 02 - 22943

Big Creek PH 2A
Visual Materials
Big Creek PH 2A - "Y" branch penstock section for Pelton leg.
photCL SCE 02 - 22935

Big Creek PH 2A
Visual Materials
Big Creek PH 2A - "Y" branch penstock section for Pelton leg.
photCL SCE 02 - 22936

Big Creek #2A
Visual Materials
Big Creek #2A - Penstock. Expansion joint below large wye branch.
photCL SCE 02 - 26980

Big Creek #2A - Penstock
Visual Materials
Big Creek #2A - Penstock - Small wye branch.
photCL SCE 02 - 26979