Big Creek Powerhouse #4
- Description
- Big Creek Powerhouse #4 - [Dam 7] Fish water turbine room.
- Date
- Dec. 1949
- Call number
- photCL SCE 02 - 29518
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #4 - Dam 7 showing fish water turbine draft tube and temporary sluice pipe.
photCL SCE 02 - 30787

Visual Materials
Big Creek Powerhouse #4 - [Dam 7] Looking upstream at fishwater turbine room, blocks #8 & #9.
photCL SCE 02 - 29528a

Visual Materials
Big Creek Powerhouse #4 - [Dam 7] Looking upstream at fishwater turbine room, blocks 8 & 9.
photCL SCE 02 - 29528b

Visual Materials
Big Creek Powerhouse #4 - Clearing tailrace for fish water release turbine.
photCL SCE 02 - 40060

Visual Materials
Big Creek Powerhouse #4 - Progress pictures (from Group 1) - Dam 7 - Fishwater Turbine Room.
photCL SCE 02 - 40671

Visual Materials
Big Creek Powerhouse #4 - Dam 7 spilling water from gates 2, 3, & 4.
photCL SCE 02 - 44893