Big Creek #4
- Description
- Big Creek #4 - Block 8 and temporary sluice pipe valve box. Note bleed water on fresh concrete. [logbook and photocard appear to be marked B.C. #1 in error]
- Date
- Dec. 1949
- Call number
- photCL SCE 02 - 29499
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek #1 - Looking upstream blocks 8 & 9. [logbook and photocard appear to be marked B.C. #1 in error]
photCL SCE 02 - 29498

Visual Materials
Big Creek Powerhouse #4 - Cavitation below butterfly valve in temporary sluice pipe.
photCL SCE 02 - 30784

Visual Materials
Big Creek Powerhouse #4 - Cavitation below temporary butterfly valve in construction sluice pipe.
photCL SCE 02 - 30783

Visual Materials
Big Creek Powerhouse #4 - [Dam 7] Upstream end of temporary sluice pipe.
photCL SCE 02 - 29524

Visual Materials
Big Creek Powerhouse #4 - Dam 7 showing fish water turbine draft tube and temporary sluice pipe.
photCL SCE 02 - 30787

Visual Materials
Big Creek Powerhouse #4 - Riverbed below Dam 7. Note temporary sluice pipe and small river flow.
photCL SCE 02 - 30397