Visual Materials
Vincent Transmission Line
- Description
- Vincent Transmission Line - Axis of Success Dam Site from Tule, Porterville Road looking northwest.
- Date
- 3/27/1947
- Call number
- photCL SCE 02 - 28170
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Vincent Transmission Line - Axis of Success Dam Site from Tule, Porterville Road looking southeast.
photCL SCE 02 - 28171

Visual Materials
Vincent Transmission line - Looking north across Tujunga Canyon Road.
photCL SCE 02 - 11577

Visual Materials
Vincent Transmission line - Road during construction looking north toward Clear Creek. (washed out above Camp 8)
photCL SCE 02 - 11574

Visual Materials
Vincent Transmission line - Terrain, looking southward from near Mile 11 Tower 1. (Construction road shows plainly in left center, and ver faintly in upper left background.
photCL SCE 02 - 11576

Visual Materials
Vincent Transmission Line - a guyed angle pole on the Vincent Telephone line, north of Gleason Pass along the road to Vincent.
photCL SCE 02 - 13562

Visual Materials
Vincent Transmission Line - [road construction].
photCL SCE 02 - 13552