Visual Materials
Big Creek, Florence Lake Dam
- Description
- Big Creek, Florence Lake Dam - View of Tombstone Creek diversion line showing a short section of exposed pipe.
- Date
- 3/31/1952
- Call number
- photCL SCE 02 - 40233
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Florence Lake Dam - Tombstone Creek diversion showing typical bend shifted by freezing in pipe.
photCL SCE 02 - 28902

Visual Materials
Big Creek, Florence Lake Dam - Tombstone Creek Diversion - pipe line should be against the rocks.
photCL SCE 02 - 29137

Visual Materials
Big Creek, Florence Lake Dam - View of 14" pipe on the Tombstone Creek diversion pipeline.
photCL SCE 02 - 40232

Visual Materials
Big Creek, Florence Lake Dam - Tombstone Creek repaired section. Creek diversion.
photCL SCE 02 - 28903

Visual Materials
Big Creek, Florence Lake Dam - Tombstone Creek Diversion - Note bent pipe up in air. Other pipe bends sunk into ground & loose.
photCL SCE 02 - 29142

Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs - View showing access hole cut in Mono-Bear Siphon pipe at Camp 62 Adit. A section of 24" O.D. pipe being taken into Adit for construction of temporary diversion. .
photCL SCE 02 - 26570A