Visual Materials
Borel Powerhouse - Borel
- Description
- Borel Powerhouse - Borel - Shot of work completed on temporary upper transition cut-over by Macco - M.K..
- Date
- 2/10/1952
- Call number
- photCL SCE 02 - 40216
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Borel Powerhouse - Borel - Shot showing work completed on temporary lower transition cut-over by Macco-M.K..
photCL SCE 02 - 40222

Visual Materials
Borel Powerhouse - Borel - Looking up canal from upper cut-over transition, showing final canal clean-up by Macco-M.K. of section used for impounding water.
photCL SCE 02 - 40217

Visual Materials
Borel Powerhouse - Borel - Shot showing flow conditions at temporary lower cut-over, with estimated flow at 500 cfs..
photCL SCE 02 - 40218

Visual Materials
Borel Powerhouse - Borel - Canal lining slope at lower cut-over transition.
photCL SCE 02 - 40196

Visual Materials
Borel Powerhouse - Borel - Start of excavation for upper cut-over transistion to new canal through Isabella Auxiliary Dam.
photCL SCE 02 - 40192

Visual Materials
Borel Powerhouse - Borel Canal - Cracking in canal bank upper end of Stavert Cut.
photCL SCE 02 - 42867