Hydroelectric operation



You might also be interested in

  • Hydroelectric power plant

    Hydroelectric power plant

    Visual Materials

    Hydroelectric power plant - Rush Creek Plant under construction

    photCL SCE 07 - 01221

  • Image not available

    Photographs of Mono Basin reservoirs and hydroelectric power plants

    Visual Materials

    Saddlebags Reservoir, Lee Vining Creek Watershed, Tioga Reservoir, Rhinedollar Reservoir, Sylvester Meadows, Rush Meadows Dam and Reservoir, Gem Lake Dam and Reservoir, Agnew Dam and Reservoir, Grant Lake Dam and Reservoir, Cain Ranch, Lee Vining Creek Cascades, Poole Powerhouse substation and penstock, Poole Powerhouse interior, Lee Vining Creek Plant No. 3, Mill Creek Plant (Lundy Powerhouse), Adams Main Plant (Owens River Gorge), Adams Cottages, and Adams Auxiliary Plant. First page states that photographs were "Taken in July, 1927, by Edwin Avery Field for the illustrated booklet of the Nevada-California Electric Corp."

    photCL SCE

  • Image not available

    California Electric Power Corp. - Southern Sierras Power Co. Hydroelectric Projects (vol 136)

    Visual Materials

    Constructing San Bernardino Steam Plant, transformer assembly, water tank, boiler construction, turbine assembly, switchyard; Facilities at Bakersfield, Goldfield, Tonopah, Owens River, Elsinore, San Bernardino, San Jacinto, Corona, Hemet, Perris, El Centro, and Coachella; Bishop hydroelectric facilities and construction of South Lake Dam; Nevada mining operations; Gem, Tioga, Saddlebags, Agnew, Summit, Rhinedollar, Crystal, Mono, and Lundy Lakes; Mill Creek hydroelectric construction, including Mill Creek [Lundy] Powerhouse, wood-stave flowline, penstock, Lundy Dam. Photographer: Southern Sierras Power Company.

    photCL SCE

  • The original Kaweah No. 1 hydroelectric plant went into operation in June 1899

    The original Kaweah No. 1 hydroelectric plant went into operation in June 1899

    Visual Materials

    The original Kaweah No. 1 hydroelectric plant went into operation in June 1899, providing energy to several Tulare County communities This was the beginnings of the Mount Whitney Power Company, which was acquired by Edison in the merger with Pacific Light & Power in 1917

    photCL SCE 12 - 00072

  • Overview shot showing construction of Rush Creek Power plant

    Overview shot showing construction of Rush Creek Power plant

    Visual Materials

    Overview shot showing construction of Rush Creek Power plant, penstocks and Agnew Dam under construction at the top.

    photCL SCE 07 - 01223

  • San Gorgonio Hydroelectric. 2 Penstock

    San Gorgonio Hydroelectric. 2 Penstock

    Visual Materials

    San Gorgonio Hydroelectric - No. 2 Penstock

    photCL SCE 07 - 00067