Borel Powerhouse - Borel Canal



You might also be interested in

  • Borel Powerhouse - Borel Conduit - Canal Intake

    Borel Powerhouse - Borel Conduit - Canal Intake

    Visual Materials

    Borel Powerhouse - Borel Conduit - Canal Intake - 3rd stage progress picture showing placement of concrete in footings in columns.

    photCL SCE 02 - 40029

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Placing 2" unreinforced concrete addition to floor slab.

    photCL SCE 02 - 30580

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Picture taken on 2/12/1951, first days placement of 3" concrete floor slab near Borel Headworks by Johnson-Western.

    photCL SCE 02 - 30547

  • Borel Powerhouse - Kern River Borel 3rd stage

    Borel Powerhouse - Kern River Borel 3rd stage

    Visual Materials

    Borel Powerhouse - Kern River Borel 3rd stage - Progress picture showing placement of transit-mix concrete in pier forms - Overflow Dam.

    photCL SCE 02 - 40051

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - 8" perforated concrete tile under-drain along centerline of canal before backfilling. Picture taken at approx. station 201+00 looking downstream. This section was repaired in 1945

    photCL SCE 02 - 30546

  • Borel Powerhouse - Borel Conduit - Overflow dam

    Borel Powerhouse - Borel Conduit - Overflow dam

    Visual Materials

    Borel Powerhouse - Borel Conduit - Overflow dam - 3rd stage - progress picture showing concrete slab after removal of existing wooden structure.

    photCL SCE 02 - 40015