Visual Materials
Borel Powerhouse - Borel Canal
- Description
- Borel Powerhouse - Borel Canal - Progress picture showing placement of 2" unreinforced concrete addition.
- Date
- 2/28/1951
- Call number
- photCL SCE 02 - 30579
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Borel Powerhouse - Borel Conduit - Canal Intake - 3rd stage progress picture showing placement of concrete in footings in columns.
photCL SCE 02 - 40029

Visual Materials
Borel Powerhouse - Borel Canal - Placing 2" unreinforced concrete addition to floor slab.
photCL SCE 02 - 30580

Visual Materials
Borel Powerhouse - Borel Canal - Picture taken on 2/12/1951, first days placement of 3" concrete floor slab near Borel Headworks by Johnson-Western.
photCL SCE 02 - 30547

Visual Materials
Borel Powerhouse - Kern River Borel 3rd stage - Progress picture showing placement of transit-mix concrete in pier forms - Overflow Dam.
photCL SCE 02 - 40051

Visual Materials
Borel Powerhouse - Borel Canal - 8" perforated concrete tile under-drain along centerline of canal before backfilling. Picture taken at approx. station 201+00 looking downstream. This section was repaired in 1945
photCL SCE 02 - 30546

Visual Materials
Borel Powerhouse - Borel Conduit - Overflow dam - 3rd stage - progress picture showing concrete slab after removal of existing wooden structure.
photCL SCE 02 - 40015