Visual Materials
Borel Powerhouse - Borel Conduit - Canal Intake - 3rd stage progress picture showing placement of concrete in footings in columns.
photCL SCE 02 - 40029

Visual Materials
Borel Powerhouse - Borel Canal - Picture taken on 2/12/1951, first days placement of 3" concrete floor slab near Borel Headworks by Johnson-Western.
photCL SCE 02 - 30547

Visual Materials
Borel Powerhouse - Borel Canal - Placing 2" unreinforced concrete addition to floor slab.
photCL SCE 02 - 30580

Visual Materials
Borel Powerhouse - Borel Canal - 8" perforated concrete tile under-drain along centerline of canal before backfilling. Picture taken at approx. station 201+00 looking downstream. This section was repaired in 1945
photCL SCE 02 - 30546

Visual Materials
Borel Powerhouse - Borel Conduit - Overflow dam - 3rd stage - progress picture showing concrete slab after removal of existing wooden structure.
photCL SCE 02 - 40015

Visual Materials
Borel Powerhouse - Borel Canal - New concrete flume.
photCL SCE 02 - 40104