Visual Materials
Borel Powerhouse - Borel Canal
You might also be interested in

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - Guniting side walls at approx. station 126+00.
photCL SCE 02 - 30545

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - Repairs guniting canal near Station 242+00.
photCL SCE 02 - 26954

Borel Powerhouse - Borel Canal - Scraping rebound from freshly applied gunited surface
Visual Materials
Borel Powerhouse - Borel Canal - Scraping rebound from freshly applied gunited surface - approx. station 126+00.
photCL SCE 02 - 30544

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - 8" perforated concrete tile under-drain along centerline of canal before backfilling. Picture taken at approx. station 201+00 looking downstream. This section was repaired in 1945
photCL SCE 02 - 30546

Borel Powerhouse - Borel Canal - Guniting on side walls with orchard heaters to prevent freezing
Visual Materials
Borel Powerhouse - Borel Canal - Guniting on side walls with orchard heaters to prevent freezing - floor not yet poured.
photCL SCE 02 - 30557

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - Placing gunite canal wall lining at approximate station 25+00 by Johnson-Western.
photCL SCE 02 - 30542