Visual Materials
Big Creek Powerhouse #4
- Description
- Big Creek Powerhouse #4 - Upper end of diversion tunnel with a flow around 5000 cfs.
- Date
- 5/19/1950
- Call number
- photCL SCE 02 - 30043
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #4 - Outlet of diversion tunnel flow about 5000 cfs.
photCL SCE 02 - 30049

Visual Materials
Big Creek Powerhouse #4 - Construction pictures taken by Dam & Tunnel Office. [upper inlet portal of Dam 7 construction diversion tunnel with bypass flow]
photCL SCE 02 - 42432

Visual Materials
Big Creek Powerhouse #4 - Looking across the dam site toward the upper portal of the diversion tunnel.
photCL SCE 02 - 29177

Visual Materials
Big Creek Powerhouse #4 - Lower end of diversion tunnel after closing bulkhead
photCL SCE 02 - 30399

Visual Materials
Big Creek Powerhouse #4 - Outlet of diversion tunnel - flow = 5500cfs [at base of Dam 7].
photCL SCE 02 - 30073

Visual Materials
Big Creek Powerhouse #4 - Detail of floor of lower end of diversion tunnel, showing one years wear on rock from normal river bed load.
photCL SCE 02 - 30396