Visual Materials
Big Creek Powerhouse #4
- Description
- Big Creek Powerhouse #4 - Powerhouse showing temporary bulkheads at ends of draft tubes.
- Date
- 5/5/1950
- Call number
- photCL SCE 02 - 30025
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #4 - Dam 7 showing fish water turbine draft tube and temporary sluice pipe.
photCL SCE 02 - 30787

Visual Materials
Big Creek Powerhouse #4 - Forming Draft Tubes and Lower Foundation of Powerhouse.
photCL SCE 02 - 41561

Visual Materials
Big Creek Powerhouse #4 - Progress pictures (from Group 1) - Powerhouse foundation work showing forms for draft tubes and sump.
photCL SCE 02 - 40620

Visual Materials
Big Creek Powerhouse #4 - [Dam 7] Upstream end of temporary sluice pipe.
photCL SCE 02 - 29524

Visual Materials
Big Creek Powerhouse #4 - Draft tube construction at Powerhouse.
photCL SCE 02 - 29670

Visual Materials
Big Creek Powerhouse #4 - Top of Dam with temporary hoists for radial gates.
photCL SCE 02 - 30377