Visual Materials
Barre-Lighthipe Transmission Line - Men placing pole with a Pile Driver
You might also be interested in

Barre-Lighthipe Transmission Line - Excavating for concrete caps ahead of pile driver
Visual Materials
Barre-Lighthipe Transmission Line - Excavating for concrete caps ahead of pile driver. - Boulder-Chino.
photCL SCE 02 - 22993

Barre-Lighthipe Transmission Line
Visual Materials
Barre-Lighthipe Transmission Line - placing concrete T91 for pile footings.
photCL SCE 02 - 23295

Barre-Lighthipe Transmission Line
Visual Materials
Barre-Lighthipe Transmission Line - Placing concrete, etc. M9-T2.
photCL SCE 02 - 23284

Barre-Lighthipe Transmission Line
Visual Materials
Barre-Lighthipe Transmission Line - Looking north from Barre Substation.
photCL SCE 02 - 23290

Barre-Lighthipe Transmission Line
Visual Materials
Barre-Lighthipe Transmission Line - tower construction at Barre Substation M15-T4.
photCL SCE 02 - 23282

Barre-Lighthipe Transmission Line
Visual Materials
Barre-Lighthipe Transmission Line - Construction alongside M. C. Transmission Lines.
photCL SCE 02 - 23536