Visual Materials
Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Barre-Lighthipe Transmission Line - Excavating for concrete caps ahead of pile driver. - Boulder-Chino.
photCL SCE 02 - 22993

Visual Materials
Barre-Lighthipe Transmission Line - placing concrete T91 for pile footings.
photCL SCE 02 - 23295

Visual Materials
Barre-Lighthipe Transmission Line - Placing concrete, etc. M9-T2.
photCL SCE 02 - 23284

Visual Materials
Barre-Lighthipe Transmission Line - Looking north from Barre Substation.
photCL SCE 02 - 23290

Visual Materials
Barre-Lighthipe Transmission Line - tower construction at Barre Substation M15-T4.
photCL SCE 02 - 23282

Visual Materials
Barre-Lighthipe Transmission Line - Construction alongside M. C. Transmission Lines.
photCL SCE 02 - 23536