Visual Materials
Big Creek, Florence Lake Dam
- Description
- Big Creek, Florence Lake Dam - Asbestile blister showing moisture and oily material on concrete.
- Date
- 3/31/1945
- Call number
- photCL SCE 02 - 26670
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Florence Lake Dam - Typical blister formed under asbestile waterproofing on arch 12 side of gunite fillet in Arch 12-13 groin while subjecting Arch 13 to 3/4 lb. air pressure for testing leaks.
photCL SCE 02 - 24878

Visual Materials
Big Creek, Florence Lake Dam - detail showing texture of Asbestile coating.
photCL SCE 02 - 27350

Visual Materials
Big Creek, Florence Lake Dam - Progress photo showing Bryant crew applying asbestile plastic to lower portion of Arch No. 51.
photCL SCE 02 - 24816

Visual Materials
Big Creek, Florence Lake Dam - Testing coatings for concrete - Arch #7 Insulmastic, Arch #8 Asbestile, & Arch #9 Carbozite.
photCL SCE 02 - 23982

Visual Materials
Big Creek, Florence Lake Dam - Fresh Asbestile on Arch 19.
photCL SCE 02 - 28893

Visual Materials
Big Creek, Florence Lake Dam - Close-up of gunite key at base of Arch #13, showing evidence of back leakage. Gunite key was covered with asbestile on November 25, 1942.
photCL SCE 02 - 24825