Visual Materials
Big Creek, Florence Lake Dam
- Description
- Big Creek, Florence Lake Dam - Ward Tunnel Repairs (1945) Between Station 110+40 and 110+61.
- Date
- 12/6/1945
- Call number
- photCL SCE 02 - 26578
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs (1945) Between Station 110+09 and 117+34.
photCL SCE 02 - 26577A

Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs (1945) Between Station 110+09 and 117+34.
photCL SCE 02 - 26577B

Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs (1945) Station 116+00.
photCL SCE 02 - 26576

Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs - Excavating for floor concrete in section at Station 330-21 to 332-23 - approximately 2,300 ft. below Adit at Camp 61.
photCL SCE 02 - 26571

Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs - View of construction plant set-up of Grafe-Callahan and Gunther and Shirley Co., Contractors, at vertical shaft in Camp 61 Adit, for concrete and gunite repairs in Ward Tunnel. .
photCL SCE 02 - 26572

Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs - View of reinforcing steel in place prior to shooting a 20-ft. circular section of gunite lining inside of present concrete lining in Ward Tunnel, approximately 3,000 ft. downstream from vertical shaft in Camp 61 Adit.
photCL SCE 02 - 26573