Big Creek, Florence Lake Dam - Ward Tunnel Repairs
You might also be interested in

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs - View of construction plant set-up of Grafe-Callahan and Gunther and Shirley Co., Contractors, at vertical shaft in Camp 61 Adit, for concrete and gunite repairs in Ward Tunnel. .
photCL SCE 02 - 26572

Big Creek, Florence Lake Dam - Ward Tunnel
Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel - Steel cover on vertical shaft at Camp 61.
photCL SCE 02 - 27234

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs - View of reinforcing steel in place prior to shooting a 20-ft. circular section of gunite lining inside of present concrete lining in Ward Tunnel, approximately 3,000 ft. downstream from vertical shaft in Camp 61 Adit.
photCL SCE 02 - 26573

Big Creek, Florence Lake Dam - Ward Tunnel Repairs
Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs - View in Adit at Camp 62 showing temporary diversion under construction.
photCL SCE 02 - 26570B

Big Creek, Florence Lake Dam - Ward Tunnel Repairs
Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs - View of the access walkway and the two 24" temporary diversion lines in place in Adit at Camp 62.
photCL SCE 02 - 26570C

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs - Excavating for floor concrete in section at Station 330-21 to 332-23 - approximately 2,300 ft. below Adit at Camp 61.
photCL SCE 02 - 26571