Visual Materials
Big Creek #1 - Penstock Protective Work - Progress near lower end encasement, showing distribution tramway car & 8" concrete placing pipe.
photCL SCE 02 - 26548B

Visual Materials
Big Creek #1 - Penstock Protective Work - Looking down encasement from Anchor at Station 73+44 showing top form ties, distribution tramway track and 8" gravity concrete placing pipeline.
photCL SCE 02 - 26548A

Visual Materials
Big Creek #1 - Penstock Protective Work - start tramway construction supported on lines 1 & 2 for distribution of concrete in protective envelope. View shows track ties in place between anchors at stations 76+33 and 77+12 at lower end of envelope. Ramp in foreground is wheelbarrow runway for back fill material over lines 1 & 2 below concrete envelope.
photCL SCE 02 - 26545A

Visual Materials
Big Creek #1 - Interior 60" Huntington Lake flowline pipe. [Worker placing alignment pins through flowline sections with sledge hammer].
photCL SCE 02 - 12353

Visual Materials
Big Creek #1 - Penstock Protective Work - Discharge end 8" concrete placing line. Taken while concreting at approx. Station 75 + 75.
photCL SCE 02 - 26549C

Visual Materials
Big Creek Powerhouse #3 - Tunnel #3, placing concrete bulkhead in Adit #1 showing anchor cut, and pipe (in center) to afford access for inspection and repairs.
photCL SCE 02 - 09111