Long Beach Steam Station, Plant #2



You might also be interested in

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Cracked flange on 11th stage heater [Plus three additional shots (#25421: cramped operating space around Unit 9, #25422: Progress construction of 8-R, & #25423: Unit #7 foundation) on same photocard].

    photCL SCE 02 - 25420

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Cleaning & repair for units 7 & 8. [Plus three additional shots (#25429: Preparing foundation for #9 west circulating water pump, #25430: Progress construction of Unit 8-R, & #25431: Installing evaporator & condensate booster pump for Unit 8-R) on same photocard].

    photCL SCE 02 - 25428

  • Long Beach Steam Station, Plant #2 - Forms & steel east footing 8-R

    Long Beach Steam Station, Plant #2 - Forms & steel east footing 8-R

    Visual Materials

    Long Beach Steam Station, Plant #2 - Forms & steel east footing 8-R [Plus three additional shots - #25394: Removal of Unit 7, #25395: Construction progress, & #25396: Construction progress Unit 8-R) on same photocard].

    photCL SCE 02 - 25393

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Forms & steel, east footing of Unit 8-R [Plus three additional shots on construction of 8-R (#25414: progress 8-R, #25418: holes cut in concrete to remove material sent to Russia, & #25419: typical cement dust coating on Plant #2 equipment) on same photocard].

    photCL SCE 02 - 25413

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Progress dismantling Unit #8. [Plus three additional Unit 8 shots (#24914: valve control board & drip pumps, #24915: deaerator vent pumps, & #24916: progress dismantling #8) on same photocard].

    photCL SCE 02 - 24913

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Treasury Dept. requisition #13 notice [Nameplate for Unit given to Russia]. [Plus two additional Unit 8 shots (#24922 & #24923: on progress dismantling #8) on same photocard].

    photCL SCE 02 - 24921