Visual Materials
Long Beach Steam Station, Plant #3
You might also be interested in

Long Beach Steam Station - BM #1 covered by concrete footing under rodman
Visual Materials
Long Beach Steam Station - BM #1 covered by concrete footing under rodman. Base of rod being held on original concrete walk, about the Elev. of covered BM#1 transferred this elev. to Bronze "A" on head wall across tunnel A. FB 5582-1 Note: 5-8 tide just covered this walk at 8:40 AM 2-20-47.
photCL SCE 02 - 27496

Long Beach Steam Station, Plant #3
Visual Materials
Long Beach Steam Station, Plant #3 - Location of former BM #1 under cone footing below Rodman.
photCL SCE 02 - 27493

Long Beach Steam Station, Plant #3
Visual Materials
Long Beach Steam Station, Plant #3 - Excavating tunnel under water.
photCL SCE 02 - 14666

Long Beach Steam Station, Plant #3
Visual Materials
Long Beach Steam Station, Plant #3 - Gauge Board under turbine
photCL SCE 02 - 15590

Long Beach Steam Station, Plant #3
Visual Materials
Long Beach Steam Station, Plant #3 - Piping under Turbo #10
photCL SCE 02 - 16031

Long Beach Steam Station, Plant #3
Visual Materials
Long Beach Steam Station, Plant #3 - View of piping under turbine.
photCL SCE 02 - 15717