Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Boulder-Chino Transmission Line (3rd)



You might also be interested in

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Camera at a position west of tower M61-4 and facing northeast. A partly unloaded trailer seen through tower leg. Edison Co. car on road, can of chlorinated lime at rear wheel.

    photCL SCE 02 - 27466

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - chlorinated lime dumping.

    photCL SCE 02 - 27467

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - chlorinated lime dumping.

    photCL SCE 02 - 27468

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - chlorinated lime dumping.

    photCL SCE 02 - 27469

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - chlorinated lime dumping.

    photCL SCE 02 - 27470

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - showing excavation of soil at and between towers 1 to 2 mile 103. 12' rod against vertical bank at right. 9' rod is 8.5' left and level with 12' rod. Both rods on centerline. Tower at left. Looking northeasterly.

    photCL SCE 02 - 27895