Long Beach Steam Station, Plant #2 - Unit #7 - Condenser front & Gage Board



You might also be interested in

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit #8 Condenser north end. [Plus three additional shots (#24902: dismantling Unit 8, #24903: Unit 8 generator air coolers, & #24904: Unit 8 auxiliary generator) on same photocard].

    photCL SCE 02 - 24901

  • Long Beach Steam Station, Plant #2 - Unit #7 - Condenser hot well & condensate pumps

    Long Beach Steam Station, Plant #2 - Unit #7 - Condenser hot well & condensate pumps

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit #7 - Condenser hot well & condensate pumps. [Plus three additional Unit 7 shots - #25232: Gland steam condenser & the jets, #25233: Main generator air coolers, & #25234: Top of Deaerator) on same photocard].

    photCL SCE 02 - 25231

  • Long Beach Steam Station, Plant #2 - Unit #7 - Condenser, rear, and atmospheric relief valve

    Long Beach Steam Station, Plant #2 - Unit #7 - Condenser, rear, and atmospheric relief valve

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit #7 - Condenser, rear, and atmospheric relief valve. [Plus three additional Unit 7 shots - #25224: Hytor Pumps, #25225: Turbine gage board, & #25226: 7 panel DC Exciter Switchboard) on same photocard].

    photCL SCE 02 - 25223

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit 8R - Condenser Upper northeast quarter of tube sheet showing disentigration, debecote and rusting of the tube sheet. [Plus three additional 8R Condenser tube sheet shots (#26018: upper southeast quarter, #26019: lower southwest quarter - debecote on sheet and tube ends, typical blistering, rusting and pitting, & #26020: lower southeast quarter showing small areas where both tubes and sheet are coated with Ferro-Prime "B" and Americote) on same photocard] .

    photCL SCE 02 - 26017

  • Long Beach Steam Station, Plant #2 - Unit #7 - CO2 and water fire control systems

    Long Beach Steam Station, Plant #2 - Unit #7 - CO2 and water fire control systems

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit #7 - CO2 and water fire control systems. [Plus three additional Unit 7 shots - #25220: Auxiliary generator air cooler, #25221: Smoke detector, & #25222: Condenser, rear, and oil coolers) on same photocard].

    photCL SCE 02 - 25219

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Placing leveling pads & sole plates for 8-R [Plus three additional shots (#25425: #7 tube sheet, typical of worst corroded section, #25426: #7 tube sheet showing point of maximum corrosion, & #25427: 8-R condenser shell) on same photocard].

    photCL SCE 02 - 25424