Visual Materials
Kern River #1
- Description
- Kern River #1 - Construction of dam foundations.
- Date
- undated
- Call number
- photCL SCE 01 - 00696
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
The Kern River #1 Hydro Plant - Democrat Dam while under construction.
photCL SCE 01 - 00597

Visual Materials
At Kern River #1 Hydro Plant, stream gauging station at the dam site near Tobias Creek prior to the construction of the dam.
photCL SCE 01 - 00593

Visual Materials
Kern River #1 - Flume at the headworks, showing the typical effect on foundations.
photCL SCE 01 - 00730
Image not available
Visual Materials
Kern River No. 1, including site for Democrat Dam; Dam construction and drainage tower; intake; dam spilling; Construction at Camp 4; Kern River Canyon, hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles; Camp 1, penstock construction, branch pipes, Powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel and buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line; Tejon, Castaic and Fernando Substations, Los Angeles No. 3 Steam Plant.
photCL SCE

Visual Materials
Democrat dam under construction for Kern River #1 Hydro Plant.
photCL SCE 01 - 00594