Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Raising boom to wash insulators on transmission tower.
photCL SCE 07 - 00906

Visual Materials
Washing insulators on double circuit tower with high pressure water gun from raised bucket
photCL SCE 07 - 00909

Visual Materials
Washing insulators on double circuit tower with high pressure water nozzle from raised bucket
photCL SCE 07 - 00910

Visual Materials
Big Creek, Shaver Lake Dam - Showing the boom plant on double compartment Lakewood Tower. - Status of construction, center portion of Shaver Dam at end of first concreting season. (Panel form system is shown.) .
photCL SCE 02 - 14302

Visual Materials
Construction of double-circuit transmission tower at substation near Santa Paula [with 7 variants]
photCL SCE 06 - 71059

Visual Materials
Building foundation, and double-circuit transmission tower under construction [with 1 variant]
photCL SCE 06 - 71070